HB-0031: 3rd, 4th, 5th Street bridges, Winston-Salem
HB-0031: 3rd, 4th, 5th Street bridges, Winston-Salem
The N.C. Department of Transportation proposes to replace the 3rd, 4th, and 5th Street bridges over U.S. 52 in Winston-Salem, Forsyth County.
Step 1
Comment responses can be found HERE.
Interactive Project Study Area Map
Project Overview
Project HB-0031 would replace the 3rd, 4th, and 5th Street bridges that cross U.S. 52 between Downtown Winston-Salem and East Winston.
The project is needed because the bridges were constructed in the early 1960s and have currently reached the end of their lifespan. The project will also improve pedestrian and bicycle connectivity between Downtown Winston-Salem and East Winston.
The 3rd, 4th, and 5th Street bridges will be replaced with similar structures. All bridges would have sidewalks on both sides, with 3rd and 4th Street having designated bike lanes and 5th Street being a transit-oriented bridge. These designs are consistent with local plans.
The project previously considered two potential alternatives on 4th Street. One alternative proposed to replace the 4th Street bridge with a pedestrian and bicycle-only facility, while the other alternative proposed to replace the bridge with a vehicular bridge that included sidewalks and buffered bicycle lanes. Based on public engagement efforts and comments received at the public meeting held on September 11, 2025, the selected alternative is the vehicular bridge alternative with multimodal accommodations. The Winston-Salem City Council formally voted to approve the recommended for this alternative at the City Council meeting on Monday, December 1, 2025.
Typical Sections
3rd and 4th Streets
5th Street
Project Funding:
Activity | Estimated Costs* |
Right-of-Way Acquisition | $ 950,000 |
Utilities | $ 50,000 |
Construction | $ 9.5 Million |
Total Cost | $ 10.5 Million |
*Costs shown are estimates and are subject to change.
Based on currently adopted NCDOT State Transportation Improvement Program.
Project Timeline:
Activity | Anticipated Date* |
Public Meeting | September 11, 2025 |
Right-of-Way Acquisition | FY 2027 |
Utilities Relocation | FY 2027 |
Construction Begins | FY 2029 |
*Future dates subject to change
Project Comments:
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
Comments for consideration during the current phase of project development
were to be submitted by October 10, 2025.
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: WS3-5Bridges@publicinput.com
Phone Number: 984-205-6615 and enter project code 11214 to leave a message
Project Contact Information
Connie James
Division Project Engineer
NCDOT Division 9
375 Silas Creek Parkway
Winston-Salem, NC 27127
Project Contact Information
Ben Crawford
Consultant Project Manager
Kimley-Horn
421 Fayetteville Street, Suite 600
Raleigh, NC 27601
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here: https://publicinput.com/ncdot-title-vi-form
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road
project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right
of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions