Project Highlights

The N.C. Department of Transportation (NCDOT) proposes to replace the bridge (referred to as Bridge No. 23) on U.S. 64 over the Nantahala River in Macon County (TIP No. BR-0028). Bridge No. 23 was constructed in 1965 and is considered structurally deficient. The fact that a bridge is "structurally deficient" does not imply that it is unsafe. It means the bridge must be monitored, inspected and repaired/replaced at an appropriate time to maintain its structural integrity.

The project proposes replacing the existing bridge with a new structure in place. The bridge will consist of two 12-foot travel lanes, with 8-ft shoulders on each side. Paved shoulders along U.S. 64 will expand up to 4' as the roadway approaches the bridge structure on each side. A temporary bridge will be constructed just south of the existing bridge for traffic flow during construction. The temporary bridge will consist of two 12-foot travel lanes with 2-ft shoulders on each side.

Project Visualization

 

 

 

Proposed Typical Sections

 

Proposed New Bridge

 

Detour Bridge

 

 

 

 

Project Funding

 

 

Estimated Amount*

Utility Costs

        $       56,959

R/W Costs

        $     310,000

Construction Costs

        $  8,700,000

Total Cost

        $  9,066,959

* Estimated costs are preliminary and subject to change

Project Timeline

 

Milestone

Date*

Environmental Document Complete

September 2023  

Right of Way Acquisition Begins

December 2023  

Construction Begins 

March 2025  

* Future dates are preliminary and subject to change

Project Comments

 

NCDOT accepts comments throughout all phases of project development.  

All comments will be taken into consideration, and carry equal weight, regardless of submittal method.

To submit comments for consideration during the current phase of project development,

please submit before September 8, 2023.


The public is encouraged to leave comments using this webspage, email, or phone number:

 

Email: US64-Nantahala-River@PublicInput.com

Phone Number: 984-205-6615      enter project code 5017

Question title

Would you like to be added to the project mailing list?

Question title

Do you have any questions or comments regarding the proposed bridge replacement?

Project Contact

 David Stutts, PE

NCDOT Structures Management Unit

Project Engineer

1581 Mail Service Center

Raleigh, NC 27699-1581

Project Contact

 Shawn Blanchard

DRMP

Senior Transportation Planner

8000 Regency Parkway, Suite 100

Cary, NC 27518

Title VI Feedback

To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?

If so, please click here: https://publicinput.com/NCDOT-Title-VI

RESOURCES FOR PROPERTY OWNERS 


Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.  

     
Right-of-Way Brochure Single Page Layout      Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions

Right of way Acquisition Process Videos

English                                                                     Spanish