Project Overview

The N.C. Department of Transportation proposes to replace the bridge on Curtis Bridge Road (S.R. 1185) over the Yadkin River in Wilkesboro, Wilkes County. The existing bridge was constructed in 1952 and is considered structurally deficient due to substructure condition. The bridge also lacks pedestrian and bicycle accommodations. Structurally deficient does not mean that the bridge is unsafe, it indicates that portions of the bridge are in poor condition and in need of significant maintenance. The proposed bridge will include two 11-foot lanes (one in each direction) and a 10-foot multi-use path for pedestrians and bicycles on the south side of the bridge. The multi-use path will be separated from the travel lanes by a raised concrete divider as shown below in the typical sections. 

Inclusion of the multi-use path is subject to participation of the local municipality. 

The project proposes to replace the bridge in its current location and offsite detour will be used during construction. The proposed vehicular detour will divert traffic from Curtis Bridge Road onto U.S. 421 during construction. 

In 2023, NCDOT Highway Division 11 secured a federal grant to replace this bridge. The project is currently in the planning and design stage.

 

Proposed Aerial View

 

 

 

Typical Section

Betterments such as sidewalks and multi-use paths are subject to municipality participation.

 

 

 

 

Project Funding:  

 Activity  

 Estimated Costs*

Right of Way Acquisition

$      527,000

Utilities 

          $      472,000

Construction

 $ 6.47 Million

Total Cost

 $ 8.58 Million

*Estimated costs are subject to change. Based on currently adopted NCDOT State Transportation Improvement Program.

Project Timeline:

 Activity   

Anticipated Date*

Environmental Document

April 2025

Right of Way Acquisition Begins

May 2026

Construction Begins

  May 2027

*Future dates subject to change

Question title

Please provide any comments or questions regarding the proposed project.

Question title

Would you like to be added to the project email list for updates?

Project Comments

 

NCDOT accepts comments throughout all phases of project development.  

All comments will be taken into consideration, and carry equal weight, regardless of submittal method.

To submit comments for consideration during the current phase of project development,

please submit before Nov. 6, 2024 


The public is encouraged to leave comments using this webpage, email, or phone number:

 

Email: curtis-bridge-wilkes-county@publicinput.com  

Phone Number:  984-205-6615 enter project code 10734 to leave a message.

PROJECT CONTACT INFORMATION 

Daniel Adams

Division Project Team Leader

NCDOT Division 11

801 Statesville Road

North Wilkesboro, NC 28659

 

PROJECT CONTACT INFORMATION 

Emaly Simone

Consultant Project Manager

Michael Baker Engineering, Inc

8000 Regency Parkway, Suite 600

Cary, NC 27518

Title VI Feedback

To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?

If so, please click here https://publicinput.com/NCDOT-Title-VI

 

RESOURCES FOR PROPERTY OWNERS 


Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.  

     
Right-of-Way Brochure Single Page Layout      Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions

Right of way Acquisition Process Videos

English                                                                     Spanish