BP4-R014 - Moonlight Road - Halifax County
BP4-R014 - Moonlight Road - Halifax County
Replacement of Bridge on Moonlight Road over Tributary of Deep Creek in Halifax County
Vicinity Map:
Detour Route Map:
Project Overview:
The N.C. department of Transportation proposes to replace and widen Bridge on Moonlight Road (S.R. 1003) over Tributary of Deep Creek in Halifax County.
Project Highlights:
The project proposes to replace Bridge over Moonlight Creek with a new bridge with two, 11’ travel lanes and 4 foot 5 inch shoulders. Paved shoulders on both sides expand to six feet as the travel lane approaches the bridge. The deck width of the bride is to be 33-feet. The project is expected to be implemented through an off-site detour. The off-site detour route includes Mary Chapel Road (S.R.1117), US 258/ Main Street and NC 125, for a total of
10.2 miles.
Project History:
The project was initiated in 2013 and was formerly known as 17BP.4.R.25. The project was recently restarted and will include a Federal Categorical Exclusion (CE) document which is the project environmetnal document. The environmental Document is scheduled to be completed Fall 2021.
Public Input:
Information will be provided to the public in a virtual format on this website. The public comment period ended for this portion of development on Nov. 19, 2021.
Project Visualizations of bridge replacements on Moonlight Road over Tributary of Deep Creek
Bridge Typical Section:
Project Funding:
BP4.R014 is listed in the State Transportation Improvement Program and funded for $ 1.1 million.
Activity | Estimated Amount* |
Project Development & Design | $ 175,000 |
Property Acqusition | $ 4,000* |
Utility Costs | $ 100,000* |
Construction Costs | $ 800,000* |
Total Cost | $ 1,079,000* |
* As shown in the currently adopted State TransporTation Improvement Program - Subject to change
Project Timeline:
Milestone | Date* |
Public outreach | Oct. 2021* |
Environmental Document | Feb. 2022* |
Right of Way Acquisition | May 2022* |
Construction begins | December 2022 |
* As shown in the currently adopted State TransporTation Improvement Program - Subject to change
Comments:
NCDOT accepts comments throughout all planning, design and construction phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
you may leave a comment or question below or email one of the project contacts.
Pre-construction Project Contact Information:
Russell Broadwell, PE
NCDOT Highway Division 4
Project Engineer
509 Ward Boulevard
Wilson, NC 27895
rebroadwell@ncdot.gov
252-640-6409
Construction Project Contact Information:
Gray Keeter
NCDOT Highway Division 4
District Engineer
14194 Hwy. 903
Halifax, NC 27839
252-583-4230
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.